/[gzz]/gzz/TODO
ViewVC logotype

Diff of /gzz/TODO

Parent Directory Parent Directory | Revision Log Revision Log | View Patch Patch

revision 1.477 by humppake, Thu Jan 2 09:06:12 2003 UTC revision 1.478 by humppake, Thu Jan 2 09:10:06 2003 UTC
# Line 151  Symbols: Line 151  Symbols:
151          + speed up tests: currently too much execfile().. could          + speed up tests: currently too much execfile().. could
152            pre-compile and exec compiled in the same globals().            pre-compile and exec compiled in the same globals().
153      humppake:      humppake:
154            - think about technical guidelines for possible field test
155              prototype of mindmap applitude (fall 2003?), check alternatives
156            - umltool paper dl 15.2., but should actually be done in the late Jan
157          - enhancing umltool          - enhancing umltool
             - make sure *ANY* document can be compiled  
               singly -- bi-directional links need not  
               work correctly, but a quick compile-fix  
               cycle is vital.  
                 - works with make documl or umldoc --  
                   but the targets need to be renamed  
                   and clarified and documented  
                 - to facilitate a faster cycle, some  
                   way to keep the process running  
                   and recompile quickly; jython start-up  
                   time is horrible.  
158              - jlinks should also work in reverse: the UML diagram              - jlinks should also work in reverse: the UML diagram
159                should generate, for each jlink, a version of the diagram                should generate, for each jlink, a version of the diagram
160                with the jlink highlighted, and place that into the HTML                with the jlink highlighted, and place that into the HTML
# Line 189  Symbols: Line 181  Symbols:
181                easily tested, make something to it                easily tested, make something to it
182              - Fix UML sequence diagram: now you have to put              - Fix UML sequence diagram: now you have to put
183                seqobjects *after* the sequence...                seqobjects *after* the sequence...
         - umltool paper dl 15.2., but should actually be done in the late Jan  
184          - split this todo into correct releases / sections :)          - split this todo into correct releases / sections :)
         - think about technical guidelines for possible field test prototype  
           of mindmap applitude (fall 2003?), check alternatives  
185          - write about representing mind map in ZZ          - write about representing mind map in ZZ
186              - how different dimensions would be used              - how different dimensions would be used
187              - how n:m associations are handled              - how n:m associations are handled

Legend:
Removed from v.1.477  
changed lines
  Added in v.1.478

savannah-hackers-public@gnu.org
ViewVC Help
Powered by ViewVC 1.1.26